Independent community site. Not affiliated with Knox County Schools.

Sources and methods

Check our work.

Every district figure in this guide links to a KCS document or recording. Every estimate of ours is labeled and can be reproduced from public data. If you find an error, it should be easy to show us where.

How to read the labels on this site: KCS a district document, slide or recording Our estimate our own analysis of public data Request something families are asking for

Primary records

District materials and meetings

Background

How the plan got here

The early record is about relieving Farragut Primary and Intermediate. It does not contain a promise that the new school would serve only Farragut, or that Choto would stay at Northshore.

June 2021
The county budgets $5 million for land under the "Farragut Elementary Grades Solution."
October 2023
The board buys 41 acres behind Ingles. At the October 26 work session, staff confirm that all three building options would require elementary rezoning. The two Farragut schools then enrolled 2,051 students against 1,781 seats, counting portables. Minutes, item 6
January 2024
Staff recommend three K-5 schools with about 2,500 combined seats and a 1,200-seat new school. The recorded assurance about assignments concerns Farragut elementary students continuing to Farragut Middle and High. Minutes, item 8 · Recording
April 2025
The board approves a $43.8 million construction contract, 9-0. The school is now described as serving up to 1,400 students.
November 2026
The district deck lists 900, 900 and 1,400 seats, 3,200 in all, and names Hardin Valley and the Kingston Pike and Northshore corridor as part of the plan. Presentation, pp. 4-8

A fair question for the board: when did the capacity assumptions change, and when did neighboring elementary zones enter the plan?

How the board says it weighs a map

Board Policy A-120 names educational opportunity, school capacity and the location of schools relative to students as the primary considerations. KCS says it also tries to follow ridges, rivers, interstates and large roads, and to keep feeder patterns together. District methodology, p. 12

Methods

How our estimates were made

The address model estimates current K-5 pupils inside each proposed boundary. At Bearden, a parent asked about current K-4 students who would have to change schools next fall. Staff offered approximate counts from memory. These are different measures, and the difference matters most for the Lotts group in Scenario 3. See the figures and recording.

Scenario zones
The KCS scenario PDFs are vector maps. We extracted the zone shapes and fitted them to county GIS zone outlines. The median outline error is 2 to 11 metres. They are reconstructions, not district files, and can be off near a street or parcel edge.
Homes
Active residential address points from county GIS, counted inside each current zone and each scenario zone. Each apartment unit with its own address point counts once. Flows under 100 addresses are fitting artifacts and are left out.
Students
We fitted enrollment against homes for nine suburban west-sector zones: about 0.14 elementary students per single-family home and 0.03 per apartment, townhouse or other unit. Each move is then scaled to its own zone's enrollment today. These describe today's students on the new lines. They are not projections, and only KCS has counts of enrolled children by address.
Building changes
Rezoned students plus half the students in each new Farragut campus zone, since both campuses become K-5. Fall 2027 figures assume equal grade sizes.
Middle school continuity
For each address, the share of other addresses in its elementary zone that feed the same middle school, averaged over 40,981 addresses that are the same in every map.
Drive times
A local road-network model on OpenStreetMap data, one representative start per neighborhood group, free-flow speeds with a small allowance for signals. Trips end at each school's approach. Car lines, queues, bus stops and construction are not modeled.
Corridor model
A lower-bound exercise that asks how many boundary moves it would take to deliver relief east of Northshore, holding the district's 2026 map labels fixed to 2030.

Map data: KGIS, Knoxville Regional TPO, TDOT, NCES, © OpenStreetMap contributors